American Electric Power

When American Electric Power (AEP) needed to replace an HMI that was failing in an outdoor application on a gas turbine they asked Midwest Engineering to quote a replacement. In turn we provided them with (3) Parker Xpress HMI’s that are monitored from the comfort of the Control Room. This solution was a third of the cost of a large automation supplier and the installation was done over two Saturdays requiring no downtime.